Week eight (Term2)
- Jasmin Mohamed
- May 22
- 1 min read
Updated: May 27
This week i got feedback from Mohamed
The feedback i got this week:
Masterplan
Design the kids play area
Refine my line work for the elevated walkway
Naturalise the river edge
Add texture
Storyboard
Switch the second and third scene positioning
Remove the machines
Scenes
show the connection of the elevated walk between the scenes
where there is no connection add a plan view of the elevated walk
The work i done during the week:
The Ecole Centrale Supélec Project design precedent research:

I researched playground projects to get some inspiration for design ideas for my site for designing a playground on site. I really liked The Ecole Centrale Supélec Project as it a natural playground that focuses on using nature as the play feature for the playground. I really liked this project as inspiration for my project as my project focuses on naturalising the River Thames so this will make sure there is a playground while maintaining a natural design feature in the site.

I really like this Black and white plan image of the design it shows how the nature has created a fun playground for the kids using on only nature.
Here i was finalising my masterplan line work using Autocad so that i can have base ti be able to render my masterplan on adobe photoshop.



adding in the proposed kids playground on masterplan line work using Autocad.

Here i started rendering masterplan using adobe photoshop after i finished drawing my design line work on Autocad.









Comments