top of page
Search

Week eight (Term2)

  • Jasmin Mohamed
  • May 22
  • 1 min read

Updated: May 27

This week i got feedback from Mohamed

The feedback i got this week:

Masterplan

  • Design the kids play area

  • Refine my line work for the elevated walkway

  • Naturalise the river edge

  • Add texture

Storyboard

  • Switch the second and third scene positioning

  • Remove the machines

Scenes

  • show the connection of the elevated walk between the scenes

  • where there is no connection add a plan view of the elevated walk


The work i done during the week:

The Ecole Centrale Supélec Project design precedent research:

I researched playground projects to get some inspiration for design ideas for my site for designing a playground on site. I really liked The Ecole Centrale Supélec Project as it a natural playground that focuses on using nature as the play feature for the playground. I really liked this project as inspiration for my project as my project focuses on naturalising the River Thames so this will make sure there is a playground while maintaining a natural design feature in the site.

I really like this Black and white plan image of the design it shows how the nature has created a fun playground for the kids using on only nature.



Here i was finalising my masterplan line work using Autocad so that i can have base ti be able to render my masterplan on adobe photoshop.

adding in the proposed kids playground on masterplan line work using Autocad.


Here i started rendering masterplan using adobe photoshop after i finished drawing my design line work on Autocad.







 
 
 

Comments


Stay connected and updated with our work.

Get in Touch

We'd love to hear from you!

500 Terry Francine Street, 6th Floor, San Francisco, CA 94158

123-456-7890

  • Facebook
  • Instagram
  • X
  • TikTok

© 2035 by Studio Course Blog. Powered and secured by Wix

bottom of page