Week Four(Term2)
- Jasmin Mohamed
- May 22
- 1 min read
These week i got feedback from Mohamed and Roo
The feedback i got:

Naturalise the water edge, make it accessible on many levels depending on the water levels
many levels
add some mounds to site to create some activity for the people
use the mounds to protect some buildings
Damage some of the buildings to give accesses to the elevated walk
Fix the elevated walk scale and consider the change in heights
consider adding more green roofs
I looked at these projects as inspiration for naturalising my water feature on the site

I like in this project how they present the accesses levels of the site depending on the tide levels through section as this is similar to what i am designing on my site

This project is also a seasonal dependent use site as it depends on the tide levels of the river which limits which paths you can use along the site. I like the way this project has naturalised the river front.

The different levels designed in this project is a feature that i really like about this as there many levels where you can accesses the site.

























Comments