Week two(term2)
- Jasmin Mohamed
- May 22
- 1 min read
The feedback i got this week on my research plan (Feedback from Roo)
put the operation of the building use on my site
how many people are engaging with the site
get some sections of my site
know what type of vegetation there is by the river front
The feedback for the proposal plan(Feedback from Roo )
work on the connectivity of the paths
work on the acesess of the elavated path
get some sections of my design proposal to explan how the elavated path will be accessed and the use of it
Put scan's of masterplan proposal
put the sketch i drew on the ipad



These are some sketches i was doing to experiment with different ways to design the elevated path.

i was inspired by this elevated pathway. I really like how curvy the shape is which allows it to be flowy. This project is Lujiatan Wetland Park Commercial Service Center by MUDA-Architects



Comments