top of page
Search

Week two(term2)

  • Jasmin Mohamed
  • May 22
  • 1 min read

The feedback i got this week on my research plan (Feedback from Roo)

  • put the operation of the building use on my site

  • how many people are engaging with the site

  • get some sections of my site

  • know what type of vegetation there is by the river front

The feedback for the proposal plan(Feedback from Roo ) 

  • work on the connectivity of the paths

  • work on the acesess of the elavated path

  • get some sections of my design proposal to explan how the elavated path will be accessed and the use of it

Put scan's of masterplan proposal

put the sketch i drew on the ipad 


These are some sketches i was doing to experiment with different ways to design the elevated path.



i was inspired by this elevated pathway. I really like how curvy the shape is which allows it to be flowy. This project is Lujiatan Wetland Park Commercial Service Center by MUDA-Architects

 
 
 

Comments


Stay connected and updated with our work.

Get in Touch

We'd love to hear from you!

500 Terry Francine Street, 6th Floor, San Francisco, CA 94158

123-456-7890

  • Facebook
  • Instagram
  • X
  • TikTok

© 2035 by Studio Course Blog. Powered and secured by Wix

bottom of page